• 4 Rollers, Forge Centre Plate Hanging Door Roller Accessories for Sliding Doors
  • 4 Rollers, Forge Centre Plate Hanging Door Roller Accessories for Sliding Doors
  • 4 Rollers, Forge Centre Plate Hanging Door Roller Accessories for Sliding Doors
  • 4 Rollers, Forge Centre Plate Hanging Door Roller Accessories for Sliding Doors
  • 4 Rollers, Forge Centre Plate Hanging Door Roller Accessories for Sliding Doors
  • 4 Rollers, Forge Centre Plate Hanging Door Roller Accessories for Sliding Doors

4 Rollers, Forge Centre Plate Hanging Door Roller Accessories for Sliding Doors

After-sales Service: 3 Year Warranty
Warranty: 3 Years
Certification: ISO
Samples:
US$ 30/Piece 1 Piece(Min.Order)
| Order Sample
Customization:
Shipping Cost:

Estimated freight per unit.

about shipping cost and estimated delivery time.
Payment Method: visa mastercard discover JCB diners club american express T/T
  Initial Payment Full Payment
Currency: US$
Return&refunds: You can apply for a refund up to 30 days after receipt of the products.
From payment to delivery, we protect your trading.
4 Rollers, Forge Centre Plate Hanging Door Roller Accessories for Sliding Doors pictures & photos
4 Rollers, Forge Centre Plate Hanging Door Roller Accessories for Sliding Doors
US $4.89-7.98 / Piece
Min. Order: 100 Pieces

360° Virtual Tour

Diamond Member Since 2015

Suppliers with verified business licenses

Secured Trading Service
Manufacturer/Factory
  • Overview
  • Product Description
  • Detailed Photos
Overview

Basic Info.

Model NO.
ECH-DR001
Splittable
Splittable
Surface Treatment
Chrome Plated
Material
Nylon
Product Name
Sliding Door Roller
Function
Stable Performance
Weight
56g
Surface Finishing
Zinc Coat
MOQ
100PCS
Transport Package
Export Packing
Specification
as the picture
Trademark
OEM
Origin
China
Production Capacity
100000

Product Description

Product Description
Welcome to Shine On
 Welcome a trial order (small quantity no problem)
 If you want more style, please contact us at any time!

Key attributes

Type roller
Feature steel
Power Source roller

Other attributes

Place of Origin Guangdong, China
Customized support OEM, ODM
Model Number ECH-DR001
Product Name Sliding door roller
Material Steel
Color Silver
Function Stable Performance
Weight 56g
Sample Avaliable
MOQ 100pcs
Surface finishing Zinc Coat

 
 
Detailed Photos


4 Rollers, Forge Centre Plate Hanging Door Roller Accessories for Sliding Doors

4 Rollers, Forge Centre Plate Hanging Door Roller Accessories for Sliding Doors
4 Rollers, Forge Centre Plate Hanging Door Roller Accessories for Sliding Doors

4 Rollers, Forge Centre Plate Hanging Door Roller Accessories for Sliding Doors
4 Rollers, Forge Centre Plate Hanging Door Roller Accessories for Sliding Doors
4 Rollers, Forge Centre Plate Hanging Door Roller Accessories for Sliding Doors
4 Rollers, Forge Centre Plate Hanging Door Roller Accessories for Sliding Doors
4 Rollers, Forge Centre Plate Hanging Door Roller Accessories for Sliding Doors
4 Rollers, Forge Centre Plate Hanging Door Roller Accessories for Sliding Doors
4 Rollers, Forge Centre Plate Hanging Door Roller Accessories for Sliding Doors
4 Rollers, Forge Centre Plate Hanging Door Roller Accessories for Sliding Doors
4 Rollers, Forge Centre Plate Hanging Door Roller Accessories for Sliding Doors
4 Rollers, Forge Centre Plate Hanging Door Roller Accessories for Sliding Doors
FAQ.
1) Are you a factory or trading company?
A: We are a trading company, We expert in door and window hardware since 2013, enjoy more than 10 years export history.

2) How can I get a sample to check your quality?
A:After price confirmation, you can require for samples to check our quality. If you just need a blank sample to check the design and papel quality, we can try our best to apply a sample for free, but you need to afford the express freight.

3) How long can I expect to get the sample?
A:After you pay the sample charge and send us confirmed files, the samples will be ready for delivery in 3-7 days. The samples will be sent to you via express and arrive in 3-5 workdays. You can use your own express account or prepay us if you do not have an account.

4) How long does the whole procedure being worked out?
A:After you place a order, the production handling time is about 20-30days.
We need 15 days to prepare all the stuff then 30 days for manufacturing.

5) What about the transportation and delivery date?
A:Normally we use shipment to transport the goods.it is about 15-20days.it also depends on which country and port you are.lt could be shorter if you need to send the goods like Asian. If there are some emergencies we can send the goods via air express, as long as you afford the traffic expense.

6) When can I get the price?
A:We usually quote within 24 hours after we get your inguiry.If you are very urgent to get the price, please call us or tell us in your email so that we will regard your inguiry priority.

7) What is the MOQ?
A:MOQ=500pcs, better price with more quantity.

8) How does your factory do regarding quality control?
A:Quality is priority. Our workers always attach great importance to Quality control from the very beginning to the very end.Each products will be inspected carefully before packing.

 

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now