PVD Gold Hidden Handle Sliding Door Hardware Invisible Flush Pull Handle

Product Details
Customization: Available
After-sales Service: 3 Years Warranty
Warranty: 3 Years Warranty
Still deciding? Get samples of US$ 10/Piece
Order Sample
Shipping & Policy
Shipping Cost: Contact the supplier about freight and estimated delivery time.
Payment Methods:
visa mastercard discover JCB diners club american express T/T
PIX SPEI OXXO PSE OZOW
  Support payments in USD
Secure payments: Every payment you make at Made-in-china.com is protected by the platform.
Refund policy: Claim a refund if your order doesn't ship, is missing, or arrives with product issues.
Manufacturer/Factory

360° Virtual Tour

Secured Trading Service
Diamond Member Since 2015

Suppliers with verified business licenses

Audited Supplier

Audited by an independent third-party inspection agency

Registered Capital
500000 RMB
Plant Area
101~500 square meters
  • PVD Gold Hidden Handle Sliding Door Hardware Invisible Flush Pull Handle
  • PVD Gold Hidden Handle Sliding Door Hardware Invisible Flush Pull Handle
  • PVD Gold Hidden Handle Sliding Door Hardware Invisible Flush Pull Handle
  • PVD Gold Hidden Handle Sliding Door Hardware Invisible Flush Pull Handle
  • PVD Gold Hidden Handle Sliding Door Hardware Invisible Flush Pull Handle
  • PVD Gold Hidden Handle Sliding Door Hardware Invisible Flush Pull Handle
Find Similar Products
  • Overview
  • Product Description
  • Detailed Photos
  • FAQ
Overview

Basic Info.

Model NO.
GDP-002
Type
Key Lock
Style
Modern
Shape
Mortise Door Lock
Anti-theft Standard
A
Part
Lock
Backset
40-50
Door Thickness Fits
35-50mm
Lock Cylinder Length
0
Usage
Household Door Locks, Bedroom, Channel Lock
Place of Origin
Guangdong,China
MOQ
500
Model Number
GDP-002
Brand Name
Ech
Term of Payment
T/T
Transport Package
Box Packing
Specification
as the picture
Trademark
H M
Origin
China

Packaging & Delivery

Package Size
40.00cm * 30.00cm * 30.00cm
Package Gross Weight
1.000kg

Product Description

Product Description

 

Specifications   

Material:zinc alloy

  • Case: Heavy Gauge, Wrought (11/16" thick)

  • Deadbolt: 1/2" thick, 1-7/32" high, 1" Throw

  • Pull: 1/2" thick, 2" high, 1-1/4" throw

  • Thumb Turn Hub: 3/16" (5mm) on the diamond. Specialty 6mm square hub available as a special order

  • Armor Front: Brass, bronze, or stainless steel

  • Strike: Single doors: 3-1/2" x 1" deadlock type

  • Double Doors: Contact us for info on #2002CPDS

  • Dust Box: For single doors. Brass, stainless steel or US10B

  • Made in China

Type: Other Door & Window Accessories
Door Thick: Fit door (40-100mm) thick
Function: PS(Passage, BK (Bathroom/Privacy),ET
Material: zinc alloy
backset 45MM
Finish: SSS,black,US3(Polished Brass), USS( Antique Brass), US26D( Satin Chrome)
Pcak: 1PC/BOX or to order
Model NO: SDL-026-golden
MOQ: 500 sets
Place of Origin: Jiangmen China (Mainland)
Brand Name: OEM
Delivery : 30 working days
Detailed Photos

 


PVD Gold Hidden Handle Sliding Door Hardware Invisible Flush Pull HandlePVD Gold Hidden Handle Sliding Door Hardware Invisible Flush Pull HandlePVD Gold Hidden Handle Sliding Door Hardware Invisible Flush Pull HandlePVD Gold Hidden Handle Sliding Door Hardware Invisible Flush Pull Handle
FAQ

1) Are you a factory or trading company?
A: We are a trading company, We expert in door and window hardware since 2013, enjoy more than 10 years export history.

2) How can I get a sample to check your quality?
A:After price confirmation, you can require for samples to check our quality. If you just need a blank sample to check the design and papel quality, we can try our best to apply a sample for free, but you need to afford the express freight.

3) How long can I expect to get the sample?
A:After you pay the sample charge and send us confirmed files, the samples will be ready for delivery in 3-7 days. The samples will be sent to you via express and arrive in 3-5 workdays. You can use your own express account or prepay us if you do not have an account.

4) How long does the whole procedure being worked out?
A:After you place a order, the production handling time is about 20-30days.
We need 15 days to prepare all the stuff then 30 days for manufacturing.

5) What about the transportation and delivery date?
A:Normally we use shipment to transport the goods.it is about 15-20days.it also depends on which country and port you are.lt could be shorter if you need to send the goods like Asian. If there are some emergencies we can send the goods via air express, as long as you afford the traffic expense.

6) When can I get the price?
A:We usually quote within 24 hours after we get your inguiry.If you are very urgent to get the price, please call us or tell us in your email so that we will regard your inguiry priority.

7) What is the MOQ?
A:MOQ=500pcs, better price with more quantity.

8) How does your factory do regarding quality control?
A:Quality is priority. Our workers always attach great importance to Quality control from the very beginning to the very end.Each products will be inspected carefully before packing.
 

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now
Contact Supplier